The house is located on a plot in Lago Sul, a residential neighborhood in Brasília. Although the project was designed in 2016, its construction was completed in two phases, the first in 2018 and the second in 2024. One o
ArchDaily Global
Lima House / BLOCO Arquitetos
Shown as published in the source's RSS feed. IndiaAIFounders doesn't link out to third-party sites — this is the complete detail available from the feed itself.