A South African Human Rights Commission report says Tshwane faces a R23bn infrastructure backlog, loses 39% of its water and has a 41% vacancy rate, while tanker costs have surged amid persistent wastewater failures.
Read the full article
A South African Human Rights Commission report says Tshwane faces a R23bn infrastructure backlog, loses 39% of its water and has a 41% vacancy rate, while tanker costs have surged amid persistent wastewater failures.
Read the full article
Shown as published in the source's RSS feed. IndiaAIFounders doesn't link out to third-party sites — this is the complete detail available from the feed itself.